I. HGY series pipelayer
I. HGY series pipelayer | ||||||
Model | HGY20 | HGY40 | HGY70 | HGY90 | ||
Max.lifting capacity | 25t | 45.7t | 70t | 90t | ||
Rated lifting capacity | 21.25t | 38.25t | 59.5t | 76.5t | ||
Operating weight(approx) | 22t | 35t | 49t | 55t | ||
Shipping outline dimension for main equipment(L*W*H) | 4150×3050×3250 (mm) | 4855×3384×3270 (mm) | 5630×3400×3540 (mm) | 5630×3436×3540 (mm) | ||
Shipping weight for main equipment | 21.5t | 26t | 37.5t | 38.9t | ||
Average ground pressure | 76.4KPa | 85.2KPa | 87.3KPa | 86.6KPa | ||
Min.ground clearance | 480mm | 490mm | 550mm | 550mm | ||
Max.gradeability | 25° | 25° | 25° | 25° | ||
Applicable environment | -50ºC ~+65ºC | -50ºC ~+65ºC | -50ºC ~+65ºC | -50ºC ~+65ºC | ||
Engine | Model | SHANGCHAI SV11CB | CUMMINS NT855-C280 | CUMMINS NT855-C280 | CUMMINS NT855-C280 | |
Rated power | 120KW | 169KW | 239KW | 257KW1850rpm | ||
Rated rotary speed | 1850rpm | 2000rpm | 2000rpm | 2000rpm | ||
Walking system | Operation mode | Joystick | Joystick | Joystick | Joystick | |
Theoretical speed | Forward(shift2) | 3.29/5.28 km/h | 3.6/6.6 km/h | 3.6/6.6 km/h | 3.6/6.6 km/h | |
Backward(shift2) | 4.28/7.59 km/h | 4.3/7.7 km/h | 4.4/7.8 km/h | 4.4/7.8 km/h | ||
Length of track on ground | 2635mm | 3050mm | 3620mm | 3620mm | ||
Track width | 560mm | 660mm | 760mm | 760mm | ||
Number of track rollers | 7×2 | 7×2 | 9×2 | 9×2 | ||
Crane system
|
Range form | The wire rope luffing form | The wire rope luffing form | The wire rope luffing form | The wire rope luffing form | |
Operating mode | The hydraulic control handle | The hydraulic control handle | The hydraulic control handle | The hydraulic control handle | ||
crane link | The length of the crane link | 6000mm | 7500/8500mm | 7600/8600mm | 8600/9600mm | |
Max lifting height | 4909mm | 6100/7050mm | 6100/7050mm | 7050/9600mm | ||
The crane link luffing angle | 0~85° | 0~86° | 0~86° | 0~86° | ||
Hook speed(six to eight times) | 0~12.0m/min | 0~6.2 m/min | 0~7.0 m/min | 0~7.0 m/min | ||
Elevating time(four to five times) | 25s | 20s | 32s | 40s |
II. HGY series welding pipelayer | |||
Model | HGY30 | ||
Max.lifting capacity | 30t | ||
Rated lifting capacity | 25.5t | ||
Operating weight(approx) | 27t | ||
Shipping outline dimension for main equipment(L*W*H) | 5771×3200×3290(mm) | ||
Shipping weight for main equipment | 26t | ||
Average ground pressure | 58.6KPa | ||
Min.ground clearance | 436mm | ||
Max.gradeability | 20° | ||
Applicable environment | -50ºC ~+65ºC | ||
Engine | Model | CUMMINS 6BTA5.9 | |
Rated power | 125KW | ||
Rated rotary speed | 2300rpm | ||
Walking system | Operation mode | The hydraulic control handle | |
Theoretical speed | Forward(shift1) | 0~2 km/h CVT | |
Backward(shift2) | 0~5 km/h CVT | ||
Length of track on ground | 3070mm | ||
Track width | 910mm | ||
Number of track rollers | 7×2 | ||
Crane system
|
Range form | The wire rope luffing form | |
Operating mode | The hydraulic control handle | ||
First crane link | The length of the crane link | 7500mm | |
Max lifting height | 6590mm | ||
Second crane link | The length of the crane link | 2600mm | |
Max lifting height | 8750mm | ||
The crane link luffing angle | 0~85° | ||
Hook speed(six to eight times) | 0~13.0m/min | ||
The crane link elevating time | go down:24s/go up:24s | ||
Generator | Nominal capacity | 85 kVA | |
The rated voltage | 380 V | ||
Frequency | 50 Hz | ||
Welding machine cabin | 2 |
Wincoo Engineering Co., Ltd (WINCOO) is engaged in bringing the most suitable solutions/equipments for client, fabricators, EPC/C companies on pipe fabrication, tank construction, pipeline construction,industrial production lines, clean energy project and other industrial field.
Our Services & Strength
*We have ability of providing workable solutions to support clients to be awarded with shorter project execution time, fewer man-hour cost and higher efficiency construction/fabrication method and better quality during phase of project bidding.
*Based client's facility/site space availability, we are able to study/design and present matched configurations on project
schedule, quality, cost and productivity to guarantee production pace is accordance with project requirement.
*To support project execution, we are always ready to work as fireman to give prompt supply on project material from different consumables, tools, equipments/machines to special merchandise. With flexibility, we are also glad to perform as procurement agent in China to seek required supply resources.