Transport Package
Wooden Box
Specification
CUSTOM MADE
Production Capacity
2000PCS/Month
Reference Price
$ 2,700.00 - 9,000.00
Description
Product Description
Product Description
Downhole Drilling Motor
Downhole motor is a kind of downhole power frilling tools by mud. The mud output by the mud pump, will enter the motor through the bypass valve, and a certain pressure difference will be formed at the inlet and outlet of motor, to push the rotor of motor to rotate, and to transfer the torque and the RPM to the drill bit via the universal shaft and the driving shaft.
Drilling downhole motors offer a wide range of configurations to meet different needs. These motors have the power, torque, and speed to drill with the PDC bits for specific downhole conditions or well designs. Using the latest available technology and materials, the motors can be used in an extensive range of drilling applications, such as:
Vertical, directional, and horizontal wells; High temperature
;
Synthetic-, oil-, and water-based mud systems
;
Performance drilling
;
Extended-reach wells.
Features:
-
Increased rate of penetration.
-
Better hole deviation control.
-
Reduction in drill string failure rate.
-
Reduction in wear and tear of the swivel, Kelly, and rotary drives.
-
Reduction in fuel cost, since compared to rotary drilling, less energy is required to power a downhole motor.
-
Big torque, high effective, wide flow rate range, running stable and long using time.
-
API Spec. Standard
Specifications:
Hole Size
|
Input Flow Rate
|
Pressure Loss
|
Bit Speed
|
Working Torque
|
Delay Dynamic Torque
|
Output Power
|
Max. Drilling Rate
|
Joint Thread
(box x box)
|
Length
|
In
|
L/S
|
Mpa
|
r/min
|
N.m
|
N.m
|
KW
|
KN
|
In
|
In
|
mm
|
3 1/4-4 3/4
|
2-4
|
3.2
|
80-160
|
615
|
1077
|
5.8-11.5
|
25
|
2 3/8REG
|
2 3/8REG
|
3423
|
4 1/8-5 5/8
|
3-8
|
3.2
|
147-392
|
504
|
882
|
8.64-23
|
30
|
2 7/8REG
|
2 7/8REG
|
2911
|
4 1/8-5 7/8
|
5-12
|
3.2
|
140-320
|
710
|
1240
|
10.5-25
|
40
|
2 7/8REG
|
2 7/8REG
|
3920
|
6-7 7/8
|
8-16
|
3.2
|
80-180
|
1850
|
3200
|
23-47
|
106
|
3 1/2REG
|
3 1/2REG
|
5039
|
8 1/8-9 5/8
|
18-30
|
3.2
|
111-167
|
4440
|
7770
|
57.6-86.4
|
160
|
4 1/2REG
|
4 1/2REG
|
7408
|
8 1/8-9 5/8
|
18-30
|
4
|
120-180
|
5135
|
8987
|
72-108
|
180
|
4 1/2REG
|
4 1/2REG
|
7748
|
8 1/8-9 5/8
|
18-30
|
4
|
120-180
|
5135
|
8987
|
72-108
|
180
|
4 1/2REG
|
4 1/2REG
|
7391
|
8 1/8-9 5/8
|
20-35
|
4
|
115-180
|
6452
|
11299
|
86.4-151.2
|
200
|
4 1/2REG
|
4 1/2REG
|
8031
|
8 1/8-9 5/8
|
20-35
|
4
|
75-180
|
6527
|
11420
|
59.5-108.6
|
160
|
4 1/2REG
|
4 1/2REG
|
8631
|
8 1/8-9 5/8
|
20-35
|
4
|
184
|
5436
|
8154
|
80-140
|
240
|
4 1/2REG
|
6 1/2REG
|
8120
|
8 1/8-9 5/8
|
20-35
|
4
|
173
|
5939
|
8908
|
80-140
|
240
|
4 1/2REG
|
6 1/2REG
|
8120
|
9 1/8-12 5/8
|
20-40
|
3.2
|
61-122
|
14118
|
14118
|
57.6-115.2
|
240
|
5 1/2REG
|
6 5/8REG
|
7998
|
9 5/8-12 1/4
|
20-40
|
4
|
85-160
|
12640
|
12640
|
72-144
|
260
|
5 1/2REG
|
6 5/8REG
|
8598
|
9 5/8-12 1/4
|
20-40
|
3.2
|
70-155
|
12289
|
12289
|
57.6-126.7
|
240
|
5 1/2REG
|
6 5/8REG
|
7798
|
9 5/8-12 1/4
|
20-40
|
4
|
70-155
|
8778
|
15362
|
72-158.4
|
260
|
5 1/2REG
|
6 5/8REG
|
8598
|
12 1/2-17 1/2
|
50-75
|
3.2
|
91-136
|
15124
|
26468
|
144-216
|
360
|
6 5/8REG
|
7 5/8REG
|
8635
|
12 1/2-17 1/2
|
50-75
|
4
|
91-136
|
18905
|
33085
|
180-270
|
450
|
6 5/8REG
|
7 5/8REG
|
9235
|
Company Profile
Packaging & Shipping
FAQ
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Western Union are the most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.
Petroleum Machinery Parts
PNEUTEC.IT, 2023