API 6A Manual Gate Valve Used in Oil Filed

Material
Alloy
Performance Requirement
Pr1, Pr2
Material Class
AA~FF
Temp.Class
P~U
Production Specification Level
Psl1~Psl4
Main Bore
2-1/16"~7-1/16"
Transport Package
Wooden Case
Origin
Jiangsu China
HS Code
8481901000
Production Capacity
1000units Per Year
Package Size
40.00cm * 30.00cm * 50.00cm
Package Gross Weight
350.000kg
Reference Price
$ 720.00 - 4,050.00

Product Description

1) our valves are designed as per API6A,6D, NACE 175;
2)The sealing face of gate and seat is overlaid-welding with carbide alloy for erosion and corrosion resistance;
3)The imported lip-type composite gate and seat, stem seal provide reliable sealing, safety and minimize operational torque;
4)Back seal structure of the stem allows the replacement of the packing under the working pressure;
5)Valve structure include two kinds:rising stem ad non-rising stem, with visible sign for opening and closing the valve;
6)Gate structure:Integral or split;
7)The seat is classified into floating and fixed structure;
8)Driving model: Manual, Hydraulic and gear drive;
9)Connection type: flange, thread, and coupling.
10) Product technical specifications: PSL1~PSL4   PR1~PR2
11)Technical parameters: 

 
API 6A Manual Gate Valve Used in Oil Filed
API 6A Manual Gate Valve Used in Oil Filed
API 6A Manual Gate Valve Used in Oil Filed



 
API 6A Manual Gate Valve Used in Oil Filed
API 6A Manual Gate Valve Used in Oil Filed
API 6A Manual Gate Valve Used in Oil Filed




Model parameters

API 6A Manual Gate Valve Used in Oil Filed


Product Line
API 6A Manual Gate Valve Used in Oil Filed

Test Equipment
API 6A Manual Gate Valve Used in Oil Filed

API 6A Manual Gate Valve Used in Oil Filed
Q1. Are you a manufacturer?
Yes, we have manufactured petroleum equipment for over 30 years. They are widely used in worldwide oilfields. 
Q2. Do your equipment come with a warranty?
Yes, we have one year warranty.
Q3. Can we customize the equipment from you?
Yes,  actually 60% of our products are customized for our clients. You just need to let us know your demand (specifications &drawing is better), and we shall realize them for you.
Q4. How do you deliver your equipment?
By sea or by  air.
Q5. What's the lead time for the equipment and its spare parts?  
Generally 30-45 days for manufacturing of complete set of equipment. Depending on the quantity, the lead time for spare parts is between 15-20 days.


 

 

PNEUTEC.IT, 2023