Product Description
METO Craft Beer Equipment
is a professional manufacturer of craft beer equipment. Our company has
integrated design, research, development, production, sales, installation, commissioning, and after-sales
service, is committed to become the world first-class craft beer equipment supplier.
>
Brewhouse Combination Diversification----Customized
>
Decoction,infusion,multi-step infusion mashing can be realized.
>
Electric,Steam,Gas directly fire heating source for optional
>
15-20 days free installation and training service offered by profession engineer.
>
Mirror polishing and wire drawing SUS 304 for optional,thickness:3-4mm
>
Rational layout, Humanized design and convenient operation
200L Micro Homebrew Beer Brewery Equipment for Sale
|
Brewing System
|
Components
|
|
Milling System
|
Miller
|
|
Heating System
|
Boiler (steam heating)
|
|
Brewhouse System
|
Mash/Lauter tun
|
Brew Kettle/
Whirlpool Tank
|
|
Hot Water Tank
|
|
Heat exchanger
|
|
Fermentation System
|
Fermentation Tank
|
|
Yeast Adding Tank
|
|
Cooling System
|
Glycol Water tank
|
|
Chiller
|
|
Pump
|
|
Cleaning System
|
Disinfection Tank
|
|
Alkali Tank
|
|
Pump
|
|
Control System
|
Control Cabinet
|
|
Optional
|
Auger System
|
|
Grain Case
|
|
Grist Hydrator
|
|
Piping flow panel for Brewhouse
|
|
Brewhouse Separate PLC Controller
|
|
Support equipments
|
Hot Products
Company Profile
Our Advantages
Packaging & Shipping
Packaging Details
1.LCL/FCL(20GP/40GP/40HQ).
2.Packed with plastic film in fumigation free wooden case or fixed with iron frame.
3.Up to export standard, suitable for delivery.
4.Customer's requirements available.
FAQ
Our service for you:
1. Free consultation service before, during, and after sales Layout plan in 3D or CAD drawings of
your brewery;
2. Professional engineers going abroad for the installation ,debugging, and training, all the
travelling cost and locate food, and hotel shall be afforded by the buyer
3. The installation period is about 15 days including assembling brewing tanks and training the
operator. It is free of charge within 15 days. The buyer will be charged USD 50 per day for each engineer
for the extended installation.
4. Round the clock assistance via phone, e-mail, Skype, Whatsapp, MSN, or any other communication
method available to the customer.
5. Assisting purchased Facilities by seller including bottling system, steam boiler, water treatment,etc. should
be installed separately. If needed, cost calculate additionally.
6. Brewing technology, brewing formula, can be offered available
7. More spare parts are available to offered freely.