Large Stock Carbon Steel Pipe for ASTM A53 Gr. a/B ERW 48mm Sch40 Hot Rolled Galvanized Steel Pipe 1 1/2 Inch Seamless Steel Pipe Price

Model NO.
ASTM A53 Gr. A/B ERW 48mm Sch40
Usage
Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose
Section Shape
Round
Inspection
SGS/TUV/BV
Transport Package
in The Bundle with Waterproof with Steel Strip
Specification
SCH40 SCH80
Trademark
HK
Origin
China
HS Code
73043190
Production Capacity
50000t/Month
Reference Price
$ 558.00 - 720.00

Product Description

Product Description
Large Stock Carbon Steel Pipe for ASTM A53 Gr. a/B ERW 48mm Sch40 Hot Rolled Galvanized Steel Pipe 1 1/2 Inch Seamless Steel Pipe Price
Specification
Product Name
Hot Dip Galvanized Round Steel Pipe / GI Pipe Pre Galvanized Steel Pipe Galvanized Tube For Construction
Material
10#, 20#, 45#, 16Mn, A53(A,B), Q235, Q345, Q195, Q215, St37, St42, St37-2, St35.4, St52.4, ST35
Wall Thickness
1MM~12MM
Outer Diameter
20MM~508MM
Length
Length:Single random length/Double random length
5m-14m,5.8m,6m,10m-12m,12m or as customer's actual reques
Standard
API 5L, ASTM A53-2007, ASTM A671-2006, ASTM A252-1998, ASTM A450-1996, ASME B36.10M-2004, ASTM A523-1996, BS 1387, BS EN10296, BS
6323, BS 6363, BS EN10219, GB/T 3091-2001, GB/T 13793-1992, GB/T9711
Grade
10#-45#, 16Mn, A53-A369, Q195-Q345, ST35-ST52
Grade A, Grade B, Grade C
Technique
Hot Dip Galvanized Round Steel Pipe
Packing
Bundle, or with all kinds of colors PVC or as your requirements
Pipe Ends
Plain end/Beveled,protected by plastic caps on both ends, cut quare,grooved,threaded and coupling,etc.

Surface Treatment
 
1. Galvanized
 
2. PVC,Black and color painting
 
3. Transparent oil,anti-rust oil
 
4. According to clients requirement

Product Application
 
1. Fence, greenhouse, door pipe,greenhouse
 
2. Low pressure liquid, water, gas, oil, line pipe
 
3. For both indoor and outdoor the building construction
 
4. Widely used in scaffolding construction which is much cheaper and convenient
Origin
Jinan China
Certificates
API ISO9001-2008,SGS.BV
Delivery Time
Usually within 10-45 days after receipt of advance payment
Product Display
Large Stock Carbon Steel Pipe for ASTM A53 Gr. a/B ERW 48mm Sch40 Hot Rolled Galvanized Steel Pipe 1 1/2 Inch Seamless Steel Pipe PriceLarge Stock Carbon Steel Pipe for ASTM A53 Gr. a/B ERW 48mm Sch40 Hot Rolled Galvanized Steel Pipe 1 1/2 Inch Seamless Steel Pipe PriceLarge Stock Carbon Steel Pipe for ASTM A53 Gr. a/B ERW 48mm Sch40 Hot Rolled Galvanized Steel Pipe 1 1/2 Inch Seamless Steel Pipe Price
Application
Large Stock Carbon Steel Pipe for ASTM A53 Gr. a/B ERW 48mm Sch40 Hot Rolled Galvanized Steel Pipe 1 1/2 Inch Seamless Steel Pipe Price
Company Profile
Large Stock Carbon Steel Pipe for ASTM A53 Gr. a/B ERW 48mm Sch40 Hot Rolled Galvanized Steel Pipe 1 1/2 Inch Seamless Steel Pipe Price
China Hongkun Supply Chain Co., Ltd.is a global company integrating production and sales. Headquartered in jinan Development Zone,Shandong Province, the company mainly deals in stainless steel, carbon steel, alloy steel, construction steel and so on.

In 2023, the trade turnover of Hongkun (shandong) Supply Chain Co., Ltd. Will reach 300 million US dollars. At the same time, the company continues to develop new markets, new customers. The company has passed SGS and BV certification. We are committed to strict quality control and considerate customer service. Our experienced staff are ready to discuss your requirements to ensure full customer satisfaction. The company has introduced a series of advanced equipment such as cutting, cutting, bending, polishing and sandblasting to meet the different needs of customers. Our business covers dozens of countries on each continent, and we have a certain scale and stable supply chain and customer base, enjoying a good reputation and reputation on the world famous platform,and our products are exported to Germany, the United States, Ukraine, Saudi Arabia, South Korea, India, Pakistan,enjoying a good reputation among customers. We also welcome OEM orders. Sincerely hope that we can develop together and create a better future. Companies adhering to the "efficient, win-win" business philosophy, continue to provide customers with professional, quality products and value added services, continuous progress and learning to meet customer needs.

Now the company has entered the period of rapid development of global trade, looking forward to more cooperation.
Certifications
Large Stock Carbon Steel Pipe for ASTM A53 Gr. a/B ERW 48mm Sch40 Hot Rolled Galvanized Steel Pipe 1 1/2 Inch Seamless Steel Pipe Price

Packing & Delivery
Large Stock Carbon Steel Pipe for ASTM A53 Gr. a/B ERW 48mm Sch40 Hot Rolled Galvanized Steel Pipe 1 1/2 Inch Seamless Steel Pipe PriceLarge Stock Carbon Steel Pipe for ASTM A53 Gr. a/B ERW 48mm Sch40 Hot Rolled Galvanized Steel Pipe 1 1/2 Inch Seamless Steel Pipe PriceLarge Stock Carbon Steel Pipe for ASTM A53 Gr. a/B ERW 48mm Sch40 Hot Rolled Galvanized Steel Pipe 1 1/2 Inch Seamless Steel Pipe Price
 Waterproof plastic bag then bundle with strip, On the all. 
 Waterproof plastic bag then bundle with strip, On the end.
 20ft container: not more than 28mt. and the lenath is not more than 5.8m. 
 40ft container: not more than 28mt. and the length is not more than 11.8m
To better ensure the safety of your goods, professional, environmentally friendly, convenient and efficient packaging services will be provided.
Q1. How long can make delivery?
A: For stock products,will make shipments in 2-5 days after receiving deposit or receiving T/T;for products need new production for common materials,usually make shipments in 7-10 days;for products need new products for special and rare materials,usually need 15-20 days to make shipment.
Q2. Can you provide the samples?
A: Samples can be provided with samples' charge and courier fee by the buyer's side.
Q3. What's your payment terms?
A: Down payments 30%TT and balance 70% TT or L/C.
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.For mass products, ship freight is prefered.
Q5. Can you accept customize?
A: Yes. It can be customized as per the customers' request.
Q6. How to ensure the quality?
A: If needed, a Third Party Inspection is acceptable

 
 

 

PNEUTEC.IT, 2023