Peek+30%Glass Fiber

Specification
dia 5.0mm and 250mm, 2000mm
Trademark
CHUNHUAN
Origin
China
HS Code
3920991000
Production Capacity
100tons Per Year
Reference Price
$ 81.00 - 109.44

Product Description

PEEK EXTRUSION RODS
The PEEK rod manufactured with continuous extrusion process has better and more stable properties.It is widely used for making components in small quantity or big size which can't be manufactured through mold injection.Our rod varied from diameter 1mm to 250mm,the length is usually 1000mm or 2000mm,we can also make the length according to the need of customer.We have in stock over 100 dimension molds for the rod extrusion.
NumberRod diameter(mm)Weight per meter(g)Dimension tolerance
(mm)
100%PEEKPEEK+30%Glass fiberPEEK+30% Carbon fiberPEEK+30%
(Carbon fiber+Graphite+PTFE)
15313334320-0.2
26424647450-0.2
37556163590-0.2
48707880750-0.2
5101071191231150-0.2
6121521691751630-0.2
7152352612702520-0.2
8183363743873610-0.2
9204134604764450-0.2
10224995565755370-0.2
11256637367617120-0.5
12288259179488870-0.5
13309431049108510140-0.5
143311361265130712220-0.5
153512751419146713710-0.5
163814991669172516120-0.5
174016581846190917830-0.5
184218252033210219640-1.0
194521022330240922500-1.0
204823862648273825570-1.0
215025862881297927830-1.0
225329023232334331220-1.0
235531223478359733590-1.0
246036994133427439910-1.0
256543174864503046980-2.0
267050555632582554400-2.0
278065867340759170890-2.0
288574288279856279950-2.0
299083219275959389570-2.0
30959265103281068299730-2.0
31100102601143811830110450-2.0
32110124031382814303133530-2.0
33120147501644617011158810-2.0
34130173011929119955186280-3.0
35140200572236523134215950-3.0
36150230162566626549247830-3.0
37160261802919430199281890-3.0
38165278383104432112299750-3.0
39180331493696438206356630-3.0
40200409054561547155440150-3.0
41220494775517657046532470-3.0
42250638667122673649687430-3.0
 
PEEK main material grade and typical properties
ItemTest StandardUnitPEEK450GPEEK450GL30PEEK450CA30PEEK450FC30
100%PEEKPEEK+30%Glass fiberPEEK+30% Carbon fiberPEEK+30%
(Carbon fiber+Graphite+PTFE)
Color  Natural or BlackNatural or BlackBlackBlack
DensityISO1183g/cm31.3±0.011.5±0.011.4±0.011.43±0.01
Water Abs(25ºC,24Hrs)ISO 62%0.50.110.060.06
Mould shrinking percentage3mm,170ºC
Flow direction
%1.20.40.10.3
Perpendicular to flow direction%1.50.80.50.5
Melting pointDSCºC343343343343
Distortion temperatureASTM D648ºC163315315293
Continuous using temperatureUL 74685ºC260260260260
Coefficient of thermal expansionASTM D 69610-5ºC2.21.52.24.7
Tensile strength(23ºC)ISO527-2/1B/50Mpa100155220134
Tensile elongation(23ºC)ISO527-2/1B/50%3421.82.2
Bending strength(23ºC)ISO 178Mpa163212298186
Compressive strength(23ºC)ASTM D695Mpa118215240150
Lzop impact strength(no gap)ISO 180/UKJ/m2No break514632
Rockwell hardnessASTM D785 10310710299
Flammable levelUL 941.51.51.50.75
Dielectric strengthIEC 248KM/mm1819  
Dielectric constantIEC 250 3.23.2  
Surface resistivity  101510153*1065*106
Friction coefficient µ0.30-0.380.38-0.460.280.18
 
Peek+30%Glass Fiber

Peek+30%Glass Fiber
Peek+30%Glass Fiber
Peek+30%Glass Fiber
Peek+30%Glass Fiber
Peek+30%Glass Fiber


Our Service
1)Your inquiry will be replied within 2 hours during working time,Within 24hours when rest time.
2)Our working time is 7.30 AM --17:30 PM,Monday to Saturday.
3)General samples time can be arranged within 2--5days.
4)Orders will be produced exactly as request and approved samples.
5)When mass production,we send photos to show the production line.And confirm the estimate time again.
6)At the end of mass production,photos and samples will send to you for approval.You can arrange the inspection.
7)Before shipment,our QC will have inspection to make sure the quality.
8)We always try best to ensure every order to delivery in time.

Payment Terms
1)T/T,Cash,L/C.
2)30% deposit,70% balance before shipment.
3)Lead time: 15 days after received deposited for 2tons.
4)Delivery way: By sea,By air, By EMS,DHL,UPS,TNT,FedEx.

Packing & Delivery
For sample: By EMS,DHL,UPS,TNT,FedEx
                 around 5--7 working days to arrive

For Bulk order:
1.Qty of 2tons,within 15 days.
2.Via Sea
3.Delivery time:we will finish production in 15days for 2tons.
4.For 20 GP,may nee around 30days.


OUR COMPANY
Peek+30%Glass Fiber
> Our factory is located in Yongsheng Industrial Development Zone,Yangzhong City,Jiangsu, which has convenient transportation and elegant surrounding.  You are warmly welcome to visit our factory. 
-> We are a Professional PTFE manufacturer.
-> We specialize in PTFE which include sheet, bar, tube, tape, film, gasket,  braided packing and all special type components. We can meet your special demand.
-> Pls feel free to contact me.I will try my best to answer your questions about our products.

 

PNEUTEC.IT, 2023