Martelo demolidor hidráulico ajustável para pilhas redondas de 300 mm

N ° de Modelo.
ES Type
peso
0,7 kg
ambiente de armazenamento
ambiente seco
período de garantia de qualidade
6 meses
Pacote de Transporte
Carton & Vacuum Packing
Especificação
720*150*200mm
Marca Registrada
WYC
Origem
China
Capacidade de Produção
5000000pieces/Year
Preço de referência
$ 52.20 - 55.80

Descrição de Produto

Adjustable Hydraulic Pile Breaker for 300-2500mm Round Piles Adjustable Hydraulic Pile Breaker for 300-2500mm Round Piles
Adjustable Hydraulic Pile Breaker for 300-2500mm Round Piles Adjustable Hydraulic Pile Breaker for 300-2500mm Round Piles
PILE HEAD CUTTER("PHC")
N AME APPLICATION PACKING
PHC(ES) Small cut pile head Ф500mm-Ф800mm 600×35mm×10pcs
PHC(S) Large cut pile head Ф900mm-Ф1200mm 700×45mm×10pcs
PHC(B) Large cut pile head Ф1300mm or more 550×70mm×10pcs
Bracket
N AME ACCESSORY
For  PHC(ES) Bracket type ESB The brackets are then fixed to the steel reinforcement cage,with the PHC at the level that the crack should form in the pile head
For  PHC(S) Bracket type B
For  PHC(B) Bracket type BB/DBB
De-bonding foam
N AME R E MARKS
De-bonding foam
for vertical reinforcement anchor bar
There are five sizes with a diameter of 16-40mm
 
Adjustable Hydraulic Pile Breaker for 300-2500mm Round Piles
How the PHC Works
 
1.  The bonding between concrete and steel is removed by covering all reinforcement bars with de-bonding covers.
2.  The PHC that is installed with the water in the concrete and expand. The expansion will cause stresses in the concrete that has set. The expansive stresses will exceed that of the compressive stress of the concrete after 3 to 4 days and hence causing a crack in the pile head.
3.  The cracking of the pile head at the position of the PHC will hardly propagate below the intended cracking line.
Components

   1.  PHC
                a) Type ES-35mmWx600mml
                b) Type S-45mmlWx700mml
                c) Type B-70mmWx550mml
   2.  Steel Reinforcement De-Bonding Covers
        Various sizes - From Φ 16mm to Φ 40mm
   3.  Steel Brackets
                a) Type ESB
                b) Type SB
                c) Type BB
                d) Type DBB
      4.   Plastic bag 
                a) 5C-W130mm-L1100mm
                b) 5C-W140mm-L1400mm

 
Installation Procedure
   
   1.  The PHC materials are fixed to the steel  Reinforcement cage prior to lowering the cage into the bored hole for concerting.
   2.  
The PHC are initially fitted to the steel brackets.
      3.   The steel brackets are then fixed to the steel reinforcement cage,with the PHC at the level that the crack should form in the pile head.
   4.  Install de-bonding covers to all the steel 
Reinforcement starter bars above the PHC.
   5.  
The installation of the PHC is complete and ready to be installed into the bored hole for concreting.
 
Pile Head Removal

   1.   After concreting, wait 4 to 5 days for crack to form at the pile head.
   2.  
When the crack at pile head has formed, the pile head can be removed by lifting it off with crane, when necessary with the aid of an excavator.
 
                                             CONFIGURATION OF PHC FOR EACH PILE SIZE
Adjustable Hydraulic Pile Breaker for 300-2500mm Round Piles

Adjustable Hydraulic Pile Breaker for 300-2500mm Round Piles Adjustable Hydraulic Pile Breaker for 300-2500mm Round Piles Adjustable Hydraulic Pile Breaker for 300-2500mm Round Piles Q: Why choose our product ?
A: Reduce labor costs, improve efficiency, save time, reduce noise, and be more environmentally friendly.

Q: Are you a manufacturer?
A: Yes,our factory was established in 2011 and we have our own trading company.

Q: What's the MOQ and payment terms?
A: MOQ is 20 pieces. Payment via T/T.

Q: How about delivery time?
A: 15-30 work days after the payment, and also depend on your quantity.

Q: How long is the shelf life of the product?
A: 
In a dry environment    6-8 month.

Q: Which country have you exported?
A:  
Most Southeast Asian countries.




























 

 

Escavadeira

PNEUTEC.IT, 2023