Alloy |
T1,T2,C10100,C10200,C
12000
,C
1220
,C1
100
,
TP1,TP2etc. |
Thickness | 0. 1 - 500 mm |
Width | Up to 1800mm |
Length | Up to 6000mm |
Hardness | 1/16 hard,1/8 hard,3/8 hard,1/4 hard,1/2hard,full hard,soft,etc |
Applications |
1
)
. Pancake Coil for ACR, General Engineering Applications
2 ) . LWC Coil for ACR, General Engineering Applications 3 ) . Straight Copper Tubes for ACR and Refrigeration 4 ) . Inner-grooved copper tube for ACR and Refrigeration 5 ) . Copper Pipe for Transportation System of water, gas and oil 6 ) .PE-coated copper tube for water/gas/oil transportation system 7 ) .Semi-finished Copper tube for industrial applications |
Surface | mill,polished,bright,oiled,hair line,brush,mirror,sand blast,or as required |
Packing | Export standard wooden pallets (as per requirements) |
Payment Terms | 30% T/T in advance as deposit,70% balance against the B/L copy or L/C at sight |
Minimum Order Quantity | 3 tons per size |
Delivery time | 10-30 days after received L/C or deposit |
Loading Port | Qingdao , China (any port in China ) |
Remark | Specific requirement of alloy grade, temper or specification can be discussed at your request |
Payment Term | T/T | EXW | 30% T/T in advance, paid the balance before shipment |
FOB | |||
CFR | 30% T/T in advance,paid the balance before shipment | ||
CIF | |||
L/C | L/C amount above 50,000 usd, we can accept L/C at sight | ||
West Union | Amount lower than 1000usd | ||
PayPal | Amount lower than 1000usd | ||
Delivery Time | 7~15days after receiving payment for one container |