Bioevopeak Ultrapure Water Purifier DI/UP Water Purifier CE certified laboratory water purification system
Water inlet= water outlet ( water outlet ≤ 120LPH , normal 90 LPH )
Case A
Water inlet= DI water outlet + UP water outlet
Case B
Water inlet= UP water outlet
Case C
Water inlet= DI water outlet
| LWP-S3-2D series | ||||||
| Type | Physicochemical | Low endotoxin | Low TOC | Comprehensive | ||
| Model | LWP-S3-2DE | LWP-S3-2DF | LWP-S3-2DV | LWP-S3-2DVF | ||
| Water requirements | Pure/distilled water enters the water | |||||
| DI water indicators | ||||||
| Resistivity | 10 to 16 MΩ. cm @ 25ºC | |||||
| Electrical conductivity | < 0.1 us/cm | |||||
| UP water indicators | ||||||
| Resistivity (25ºC) | 18.2 MΩ. cm @ 25ºC | |||||
| Heavy metal ion | < 0.01 PPb | |||||
| Total organic carbon (TOC) * | <10 PPb | <3 PPb | ||||
| Bacteria | < 0.01 cfu/ml | |||||
| Pyrogen (endotoxin) | N/A | < 0.001 Eu/ml | N/A | < 0.001 Eu/ml | ||
| Particulate matter (> 0.1 microns) | <1/ml | |||||
| Ribonuclease (RNases) | N/A | <1pg/ml | N/A | <1pg/ml | ||
| Deoxyribonucleases | N/A | <5pg/ml | N/A | <5pg/ml | ||
|
Dimensions
(L×W×H) |
41*27*50cm | |||||
| Weight | 30Kg | 31Kg | 31Kg | 32Kg | ||
| Electricity | 100-240V, 50/60Hz, 48-72W | |||||
| System configuration | Host (including 1 set of purification column)+TDS pen + accessory bag | |||||
Q: How about quality of the goods?
A:
l All the running products comply with CE standards.
l Independent quality inspection team, conducting multiple inspections and random inspections from parts supply to product dispatch.
l Well-known third-party testing service available, such as SGS, BV, and TUV, etc.
Q: What are your pre- and after-sales services?
A:
l Timely reply to pre-sales enquiries
l Real-time update of manufacturing and shipment status
l Contracted third-party maintenance company in over 60 countries
Assured availability of parts supply for 10 years at least
Q: Is OEM service available.
A: Most of the running products are available for OEM customization, including logo, package and function, if attainable, customization.
Q: How long is the lead time:
A: Generally, the lead time for most stocked products is about 7~15 days, vary by models and production schedule. For those non-stocked products, the manufacturing lead time is around 20 days.