Factory Direct Sale Mobile Stationary Asphalt Mixing Plant Concrete Asphalt Plant

Model NO.
LB
Certification
ISO9001: 2000, CE
Condition
New
Drum Dryer
Including
Fuel Burner
Providing
Bitumen Tank
30t
Capacity
10-500tph
Transport Package
Nude Packing
Trademark
shengmao
Origin
China
HS Code
8474320000
Production Capacity
20-320t/H
Reference Price
$ 5,220.00 - 33,120.00

Product Description

Product Description

Factory Direct Sale Mobile Stationary Asphalt Mixing Plant Concrete Asphalt Plant

The stationary asphalt mixing plant is designed to meet the requirements of high grade highway construction. LB series stationary asphalt mixing plant has quality up to the internationally leading level. The plant is designed with optimized structure, which is highly automatic and reliable. It is composed of the cold aggregate bin, drum dryer, batcher, aggregate elevator, screening and measuring device, hot oil heating type bitumen supply tank, cyclone and impulse dust collecting system. The whole equipment is automatically controlled by the computer.
 
Model LB1500 LB2000 LB3000 LB4000 LB5000
Rated output 120t/h 160t/h 240t/h 320t/h 400t/h
Number of cold material hoppers 4x9 m³ 5x20 m³ 5x20 m³ 6x20 m³ 6x20 m³
Number of screen layesrs 4 layes 5 layes 5 layes 6 layes 6 layes
Capacity of mixer 1500kg 2000kg 3000kg 4000kg 5000kg
Capactiy of finished product silo 90t 150t 250t 250t 250t
Standard footprint 28mx47m 35mx50m 42mx56m 46mx58m 56mx59m
Standard power installed 372kW 453kW 650kW 782kW 949kW
 
Detailed Picture and Specification
 
Factory Direct Sale Mobile Stationary Asphalt Mixing Plant Concrete Asphalt Plant
Factory Direct Sale Mobile Stationary Asphalt Mixing Plant Concrete Asphalt Plant
Factory Direct Sale Mobile Stationary Asphalt Mixing Plant Concrete Asphalt Plant
Our Projects
Factory Direct Sale Mobile Stationary Asphalt Mixing Plant Concrete Asphalt Plant
After-sales Service
1. we provide foundation drawing, circuit diagram
2. we will provide CI, PL, BL , CO and other documents for clients to clear the customs
3. we will send engineers to client's job site to held intall the machine and train the operators
4. Our staff will regularly visit client's job site to ensure client use the machine convinently (usually once within 3 months)

 

PNEUTEC.IT, 2023