Hnarl Genie Lift Parts 12V Shutdown Solenoid Ge-94675 94675 94675gt

Model NO.
94675GT
Application1
Used for Genie Lift
Weight
0.500 Kg
Stock
Enough
Compatible Equipment Make
Genie
Part Number
94675gt
Compatible Equipment Type
Genie Lift
Part Type
12V Shutdown Solenoid
Transport Package
Standard Export Packing
Specification
Standard Export Packing
Trademark
HNARL
Origin
China
Production Capacity
500pieces/Week
Reference Price
$ 37.93 - 38.70

Product Description

Hnarl Genie Lift Parts 12V Shutdown Solenoid Ge-94675 94675 94675gt
HNARL Genie Lift Parts 12V Shutdown Solenoid GE-94675 94675 94675GT
 
Products Description
12V Shutdown Solenoid 94675 94675GT
Parts No:
94675GT
Used For Genie Lift
-GS-2668 RT (From Serial Number 101 To 41199)-->300 Engine Components 
-GS-2668 RT (From Serial Number 41200)-->300 Engine Components 
-GS-3268 RT (From Serial Number 101 To 41199)-->300 Engine Components 
-GS-3268 RT (From Serial Number 41200)-->300 Engine Components 
-Z-34/22 IC (From Serial Number 0001 To 0780)-->400 Power Plants 
-Z-34/22 IC (From Serial Number 0781 To 9606)-->400 Engine Components 
-Z-34/22 IC (From Serial Number 0781 To 9606)-->400 Engine Components 
Z-45/22 MP (From Serial Number 641 To 9999)-->300 Power Options
 
Packing Specifications:
Length (mm)
120
Width (mm)
80
Height (mm)
60
Weight (kg)
0.5
Hnarl Genie Lift Parts 12V Shutdown Solenoid Ge-94675 94675 94675gt
Hnarl Genie Lift Parts 12V Shutdown Solenoid Ge-94675 94675 94675gt
Hnarl Genie Lift Parts 12V Shutdown Solenoid Ge-94675 94675 94675gt

Hnarl Genie Lift Parts 12V Shutdown Solenoid Ge-94675 94675 94675gt

Hnarl Genie Lift Parts 12V Shutdown Solenoid Ge-94675 94675 94675gt
Product Delivery
Shipping Time
Start & End
Descriptions
By Express.
DHL, FedEx, UPS, TNT, EMS, ARAMEX, ect
3-8 working days
Door to Door
For Small order, Sample order, Trial order
Fast & Convenient
Air Transportation
By Plane
5-10 working days
Door to Airport
For Medium order
Fast & Cheaper than express
The consignee needs to take delivery at the airport
Sea Transportation
By Vessel
20-45 days
Door to Seaport
For Mass order
Cheap but take time
The consignee needs to take delivery at the seaport
FAQ
Q1: How can I place order?
A: You can contact us by email about your order details, or place order on line.

Q2: How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Paypal, Western Union are the most usual ways we are using.

Q3: What's the order procedure?
A: First we discuss order details, production details by email or TM.
Then we issue you an PI for your confirmation. You will be requested to do pre-paid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15 days if we don't have the items in stock. Before production has been finished, we will contact you for
shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.

Q4: How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.

Q5: How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure
 
Q6. How does your factory do regarding quality control?
A: Quality is priority. We always attach great importance to quality controlling from raw material to the very end product. Our factory has gained CE and ISO 13485 authentication.

 

 

PNEUTEC.IT, 2023