New Generation Energy Saving Ice Cube Machine 8tons/Day CE Approved for Hotel Restaurant Bar Night Clubs
1. Capacity: 8tons in 24hrs
2. Ice size: 22mm*22mm*22mm or 29mm*29mm*22mm
3. Ice freezing time: 20 to 23 minutes
4. PLC program control
5. Supply power: 380V/50Hz/3P or 220V~240V/ 60Hz/3P
6. Refrigerant: R22/R449/R507/R404a
CV8000 cube ice machine is made up of two parts: Cube ice machine & cooling tower.
Cube Ice Machine is: 4900mm*2100mm*2100mm
Cooling tower: 1700mm*1700mm*1800mm
Koller large capacity edible ice cube machine daily capacity from 1 ton to 20tons
Model
|
Capacity
(Ton/24hrs)
|
Compressor
Power(KW)
|
Compressor
brand
|
Outer Dimension(mm)
(Length*Width*Height)
|
CV1000
|
1
|
3
|
Bit zer/Refcomp
|
1380*1440*1800
|
CV2000
|
2
|
6
|
Bit zer/Refcomp
|
1770*1510*2040
|
CV3000
|
3
|
9
|
Bit zer/Refcomp
|
2070*1920*2030
|
CV4000
|
4
|
15
|
Bit zer/Refcomp
|
2690*1930*1870
|
CV5000
|
5
|
18.5
|
Bit zer/Refcomp
|
3060*1920*2023
|
CV6000
|
6
|
22.5
|
Bit zer/Refcomp
|
4000*2100*2100
|
CV8000
|
8
|
30
|
Bit zer/Refcomp
|
5200*2050*2100
|
CV10000
|
10
|
37.5
|
Bit zer/Refcomp
|
5880*2050*2100
|
CV20000
|
20
|
74.30
|
Bit zer/Refcomp
|
11600*2100*2100
|
3. Installation:
All necessary parts such as water pipes, water pumps and accessories are offered free of charge when delivery.
Operational manual and CD will be offered to guide the installation.
1). Installing by the user: We will tested and install well the machine before shipment, all necessary spare parts, operation manual and CD are provided to guide the installation.
2). Installing by Koller engineers:
(1) We can send our engineer to assist the installation and provide technical support and train your workers. The end-user provide accommodation and round-trip ticket for our engineer.
(2) Before our engineer arrived in your site, the installation place, electricity, water and installation tools should be ready. Meanwhile, we will provide you a Tool List with the machine when delivery.
(3) All spare parts are provided according to our standard. During installation period, any shortage of parts due to the actual installation site, the buyer is required to afford the cost, such as water pipes.
(4) 2~ 3 workers are required to assist the installation for big project.
(5) Any delay due to customer's reason, it will be charged from the 8thday, USD100/day for one person as installation fee. Free of charge for one week.
4. Warranty period: One year for the machine. If there are some problems, we will try our best to solve it. Meanwhile, we will offer you some spared parts.
5. Delivery time: 30 days after receiving the advanced payment.